Articles
A complete cable network out of a hat!
Peter Lampel Time-to-market is a familiar buzz word for any engineer. Meeting these demands requires early concept testing where simulations have become an indispensable tool. This approach is particularly useful when developing cable TV components, which must cope with many different types of interference.
Tags: iss079 | cable network | out of a hat | cable tv | broadcasts | satellite | transmission | interference | Peter Lampel
Contributing Author Peter Lampel Click to read
Easy and accurate testing of low-power transmitters for digital TV
N/A Twenty-five kilograms or more: That is how much the test equipment needed for testing digital television transmitters a test receiver, spectrum analyzer, and power meter weigh all together. This weight is not an issue for a transmitter like the one on the Olympic Tower in Munich. It is easily accessible with a van and the elevators in the tower. But what about the many gap-filler stations and transposers?
Tags: iss054 | transmitters | installation | gap-filler | sfn | bandstop filter | ofdm carrier | dvb-t | Rohde & Schwarz | N/A
Contributing Author N/A Click to read
Total Articles: 2 [1-2]