News
FOR-A Switcher Meets Growing Technical Demands for First Baptist Church Oviedo Posted: 22/07/2014
FOR-A Switcher Meets Growing Technical Demands for First Baptist Church Oviedo

Established in the 1800s, First Baptist Oviedo is a longstanding Florida-based house of worship that has drastically altered its use of technology in recent years. In 2009, First Baptist Oviedo built a 2,700-seat worship center. Since that time, the church has delivered its message to a wider audience through live streaming, sermon archiving, and the production of podcasts on its website, as well as through its weekly shows on local television.

Tags: houses of worship | church production | FOR-A | video switchers | video switching | video production | church technology
Submitted by Pipeline Communications
More from this author
Kensington Church Relies on FOR-A Video Switcher While Transitioning to Full HD Production Posted: 29/07/2013
Kensington Church Relies on FOR-A Video Switcher While Transitioning to Full HD Production

Kensington Church had been using their existing switcher for years when they decided to upgrade to a FOR-A HVS-390HS video switcher, but the move came sooner than expected when the current switcher gave out right before Easter weekend. The metro Detroit-based church called in local systems integrator Advanced Lighting & Sound to gut out the old equipment, install the new HVS-390HS switcher, have it operational for service the next morning, and show a volunteer how to use it. Thanks to the integrators expertise, some hard work, and the user friendly HVS-390HS switcher, Kensington Church went on to produce hiccup-free holiday weekend services and has been relying on the switcher ever since.

Tags: FOR-A | video switcher | production switcher | church production | church technology | Kensington Church | HVS-390HS
Submitted by Pipeline Communications
More from this author
Pages:   [1]